Longitudinal Alignment
Loading (MAN) - ShuttleLoad (module 3a)
602701-9021-404
ZEISS shuttle station for manual loading system:
- high throughput and utilization of CMM due to simultaneous setup during the ongoing measurement.
- fast, ergonomic feeding of pre-setup pallets by manually shiftable feeding slide.
- protection of CMM by mechanical decoupling from shuttle station.
- height compensation for on-site floor unevenness using levelling equipment at the aluminum profile.
Recently Viewed
Loading (MAN) - ShuttleLoad (module 3a)
602701-9021-404
277.875,00 krexcl. VAT
Longer delivery time
1/4-star stylus M3 XXT, DK3 L40
626103-0312-040
995,00 krexcl. VAT
Available
0,00 krexcl. VAT
Available
Stylus straight M3 XXT, DK5 L75
626103-0500-075
1.136,00 krexcl. VAT
Available